|
[SAK] Rasic사와 캘리포니아 물 프로젝트 진행
미주리주 오팰런(O’Fallon) 기반의 기업 SAK 콘스트럭션(SAK Construction)은 자사의 수도 인프라 조달업체를 캘리포니아 노스할리우드(North Hollywood)에서 진행되는 ‘강물 공급도관 개선 상층부(River Supply Conduit Improvement Upper Reach, RSCIUR) 장치’ 5·6 프로젝트를 진행하는 합작벤처 파트너사로 고려하고 있다고 밝혔다.
SAK와 캘리포니아 롱비치(Long Beach) 기반의 기업 W.A 레이직 콘스트럭션(W.A. Rasic Construction Co.)은 지난해 봄 로스앤젤레스 수전력부가 진행하는 9천150만 달러 규모의 프로젝트를 착공에 들어간 바 있다. 이 프로젝트는 2018년 초 완공될 예정이다.
[원문보기]
Water Project in North Hollywood, Calif. installed by SAK Construction and W.A. Rasic Construction
O’Fallon, Missouri-based SAK Construction can now consider itself water infrastructure purveyor to the stars as it teams with a joint venture partner to advance the River Supply Conduit Improvement Upper Reach (RSCIUR) Units 5 and 6 project in North Hollywood, California.
SAK and Long Beach, Calif.-based W.A. Rasic Construction Co. Inc. began work on the $91.5 million project for the Los Angeles Department of Water and Power (LADWP) in spring of 2015. Completion is scheduled for early 2018.
The assignment requires the contractors to apply open trench and tunneling strategies to install 15,768 linear feet of 78-inch diameter welded steel pipe and appurtenances. The open trench approach is to be applied to 5,411 linear feet; tunneling to 10,357 feet.
Originally built in the 1940s using concrete pipe, the 30,000-linear-foot RSC is a major conduit for the transmission of water from LADWP’s North Hollywood Pump Station to the Headworks Spreading Ground in central Los Angeles. After more than 70 years of service, the concrete pipe is showing wear.
The new infrastructure will boost capacity and help the district meet updated state standards for water pressure, enhance system reliability, minimize air entrainment to improve water flow and widen operational flexibility within the distribution system. It will also help LADWP meet new, tougher federal and state water quality regulations by setting the stage for the city’s conversion to chloramines to disinfect drinking water.
"After a hiatus of several years, the SAK tunnel management team is thrilled to return to the West Coast to take on this technically challenging tunnel project," said Brent Duncan, senior project manager at SAK Construction. "Excavating five separate tunnels in the middle of busy North Hollywood streets has required the project management team to solve problems with creative, unconventional methods to ensure successful completion. Our highly experienced SAK team is well suited to tackle the demands presented by this project. We look forward to a successful completion in 2017."
Based in O’Fallon, Missouri, and with regional offices in Maryland, California and Tennessee, SAK has active projects across the U.S. The company solves the challenge of maintaining and restoring aging water and sanitary infrastructure for the municipal, energy and industrial markets. With industry-leading experience and a commitment to service excellence, SAK is a trusted partner helping customers worldwide renew, protect and expand their pipeline infrastructure.
[출처 = Water World / 2016년 5월 26일]
|