| [스페인] 알베리아서 1억3천만유로 해수담수화 플랜트 연구
Campo Dalias 해수담수화 플랜트가 스페인 남부지방 알베리아의 Andalusian 마을 주민 30만 명에게 하루 10만㎥의 물을 곧 공급하게 될 예정이다. Campo de Dalias 프로젝트는 스페인 환경부가 시작한 국가 담수화 플랜트 프로그램의 일환으로 공공수도사업자 Acuamed가 계획 개발 책임을 맡았다.
총 1억3천만 유로 규모의 이번 프로젝트에서 베올리아 워터 솔루션 & 테크놀로지는 공정 구성요소를 책임지게 됐으며, 스페인 기업 Sando, Inypsa, Montajes Electricos Crescencio Perez는 시공, 토목공학 및 관리 요소를 도맡았다. 생산수는 식수 및 관개용수로 공급될 예정이다.
[원문보기]
€130m seawater desalination plant ready for business in Almeria, Spain
The Campo Dalias seawater desalination plant will soon provide nearly 100,000 m3/day of water for 300,000 people in the western part of the Andalusian province of Almeria, in the South of Spain.
The Campo de Dalias project is part of the national desalination plant program launched by the Spanish Ministry for the Environment through Acuamed, the public water agency responsible for the development of the plan.
Costing 130 million euros, Veolia Water Solutions & Technologies was in charge of the process components, and Spanish companies Sando, Inypsa and Montajes Electricos Crescencio Perez were responsible for the construction, civil engineering and management components.
Produced water will be used for drinking and irrigation purposes.
The 97,200 m3/day plant will be operated by Veolia for 15 years and has been designed for an expansion to 129,600 m3/d should extra capacity be needed in the future.
The process begins with the intake of the raw water via a 1.6 kilometer-long submarine pipe.
The water is first pre-treated by a battery of 40 double-stage filters before going to the double-pass reverse osmosis. The first pass consists of six reverse osmosis skids, equipped with an Energy Recovery System (ERS) in the form of isobaric chambers.
A second reverse osmosis pass with six skids is required to reduce boron concentration under 0.5 mg/l to comply with irrigation requirements.
The water distribution network is also part of the work scope and includes a 41 km gravity distribution network to deliver the produced water to end users.
Jose Angel Legaz, managing director for Veolia Water Technologies in Spain and Portugal, said: “Since last July, the plant has been providing water for agriculture and it will be operating at full capacity as of November to supply water to this water-scarce region of Spain.”
[출처 = Water World / 2015년 10월 26일]
|