| [오만] 담수화 플랜트 고장에 따른 올바른 설명서 내놓을 예정
지난 5월에 발행된 전기 규정에 대한 오만 기관의 발행 보고서에 따르면 오만 Sohar사는 담수화 플랜트의 물 공급 방식에서 전력에 심각한 손실을 입은 원인으로 직원의 비상기술 부족과 조작 매뉴얼 지침을 따르지 않았기 때문으로 예상된다. 이에 Sohar사에서의 기계 고장 및 지난 5월 19일에 North Al Batinah 지역의 해수담수화 시설의 물공급 부족에 대한 공식적인 조사가 시작됐다.
Qais Saud Al Zakwani의 전무이사는 최근 기자회견을 통해 “Sohar사의 이번 조사는 국민에게 많은 고통을 일으키는 원인이 된 North Al Batinah 지역의 광범위한 물부족이 원인이며, 당국은 사건에 대한 공식적인 조사를 실시하고 공공 검사에 대한 보고서를 사용할 수 있도록 할 것”이라고 말했다.
[원문보기]
Probe finds staff ignored manual as Oman desalination plant went down
Lack of staff emergency skills and failure to follow operating manual instructions were among the reasons for a catastrophic loss of power and water production at Oman's Sohar 1 power and desalination plant in May according to a report issued by the Oman Authority for Electricity Regulation.
The report followed a formal investigation into the breakdown at the Sohar Power Company's (SPC's) power and desalination facility which led to loss of water supplies in North Al Batinah on 5 and 19 May this year.
"The Sohar incident caused extensive water shortage in North Al Batinah governorate and caused much distress to the public. The authority conducted a formal investigation into the incident and is making the report available for public inspection," executive director of the regulator, Qais Saud Al Zakwani, told a recent press conference.
Local media reported that the investigation found that the SPC did not have enough personnel onsite with the skills to troubleshoot the problems being encountered. It had to recruit personnel from other plants to assist. Staff failed even to following the operation manual instructions the report said.
The investigation found that prolonged flooding of a switchgear and control room for the SPC seawater supply pumps followed a rupture to a seawater supply pipe at the Oman Oil Refineries and Petroleum Industries Company (Orpic) facilities on 3 May.
The seawater remained for three days which probably breached cable insulation the report said. Short circuits caused by this breach in all likelihood caused the observed repeated and sporadic fault signals that led to shutdown of field instrument communication interface modules.
The delay in starting to remove the flood water would certainly have contributed to the degradation of any instrumentation cables with damaged outer sheaths the report said. The SPC was dependent on Orpic and Majis Industrial Supply Company (MISC) to clear the flood water.
The plant remained operational while flood water removal was in progress but the power plant tripped on May 5 resulting in loss of power and desalination.
The Authority for Electricity Regulation, contracted Worley Parsons Oman Engineering to explain the causes of the plant outage and to provide recommendations to avoid a recurrence. The authority said that it would act to ensure that all of the recommendations/actions were implemented by the SPC.
[출처 = Desalination & Water Reuse / 2015년 7월 14일] |